Centrepoint
Construction of 4 new flats, steel frame with cedar cladding. Works included underfloor heating, wooden flooring to lounge/diner, curtain walling to external elevations to provide natural light, ply membrane roofing material, brise soliel to provide shade to window elevations in summer and Part 8 access requirements included.
The works also included the refurbishment of the existing schoolhouse into 3 flats, creation of an internal courtyard with trees and benches, a separate laundry facility, external toilet and bin store for tenants use and a safety gate.